We have successfully completed the construction project in Diepflingen. In cooperation with Rudolf Wirz AG, Lissag AG, EBL and Sutter Ingenieur- & Planungsbüro AG, we installed a total of 10 house connections (water & electricity). Over the entire duration of the construction site, we pulled in 157.5m of pipe without trenches.
Our employees proved their skills by pulling in two 38m protective pipes parallel to each other (see photo).
Comentários